Installation
Instructions ( Download Adobe Reader to view this PDF file )
- Please read the Safety Measures before installing your
Jeeves Heated Towel Rail.
- All installations should be in accordance with National
and Local electrical codes.
- The Heated Towel Rail should be installed by a certified
electrician.
- To ensure the Heated Towel Rail is mounted securely,
fasteners for the left side tube assemblies (fig.1.a.) should
be secured in studs, or structural members (e.g. headers)
that are placed behind the rails, and fasteners for the
right side must be installed, in structural members that
are placed behind the rails to allow for proper mounting
of the junction box.
STEP
1
Attach the 4 stainless steel tube assemblies (a) onto the unit
as shown in Fig 1
Allow the set screw to face downwards.
Install and secure one slotted bolt (b) through the center of
the white bushing, threading it onto the nut welded on the unit.
STEP 2
Decide where to install unit and the location of the single
gang junction box.
This can be done by either placing the assembled rail against
the wall or taking approximate dimensions from the drawing supplied.
Remember: Unit should not be mounted closer than 2 inches below
an overhanging surface (i.e. shelf) and no closer than 1-1/4
inches above the floor and/or baseboard.
STEP 3
Install single gang junction box in the desired position.
Secure supplied cover plate onto box.
Place unit against wall with wire cover tube inserted in cover
plate.
To achieve this, the cord needs to be fed through the slot at
the end of the tube.
Make sure that the unit is mounted squarely.
Use a pencil to lightly mark the position of all four tubes.
STEP 4
Remove unit and center the marking disk in the circles marked
on the wall in Step 3.
Place the tapered bushing (c) onto the center of the circles
marked in Fig 3. and insert supplied screw through center of
the tapered bushing and fasten to wall as in Fig 4.
If rail is installed on a tiled surface use a toggle bolt anchor.

STEP 5
Remove the cover plate and slide it to the back of the wire
cover tube. Now place the unit over the tapered bushings installed
in Step 4.
Securely hand-tighten each of the four set screws on the bottom
of the tubes.
Remove wire from slot in the end of the horizontal tube.
Position the wire from the rail and the wire from the junction
box to allow for connection. (Fig 5)
Splice the wires using the connectors provided and place them
inside the junction box.
Cover the box with the plate and secure with screws provided.
STEP 6
The towel rails needs to be controlled by a on/off switch or
a timer.
(Fig 6)
Make sure one is provided for at installation.
Plug can be added by the 30 inch wire.
Optional:
Wire can be put on the left.
Timer.
See wiring diagram below:

SAFETY MEASURES
Types of Safety Measures
- Warning: States
a hazard which may pose serious injury or death if exact
installation instructions are not
followed.
- Caution: States
a hazard which may pose minor injury and/or product damage
if installation instructions
are not followed.
- Note: Helpful information
which will facilitate installation.
- Warnings
- These units should be installed by a certified electrician.
- Follow these installation instructions carefully
to ensure unit is properly attached to the wall.
- To avoid a possible fire hazard, it is essential
unit is mounted in accordance with guidelines stated
in
these instruction.
- Unit is intended for indoor use only.
- Do not place units inside a shower, sauna, steam
room, or wherever unit would be exposed to water.
- Do not place unit where, if the mounting hardware
were to loosen, it could potentially fall into water
(i.e.,
a bathtub, whirlpool, etc.)
- The unit must be installed in an upright position
with the wire cover tube/junction box being positioned
at
the bottom.
- Cautions
- Ensure that unit is securely fixed to the wall. Unit
is designed for drying towels. Under no circumstances
should anybody climb on or hang on unit.
- The fasteners provided with the installation kit are
for convenience only and are not suitable for all
installation conditions – it is the ultimate responsibility
of the installer to ensure proper mounting
hardware is employed in attaching the unit to the wall.
- Surface of unit is hot when on.
- Notes
- Towels which contain soap or detergent residue may
appear to have scorch marks; however, this is
simply discoloration of the residue in the towels themselves.
The unit does not reach a temperature
sufficient to scorch towels.
- Jeeves heated towel rails are constructed from 304
stainless steel. They are extremely durable. To
maintain a good appearance follow these simple care
instructions:
- For routine cleaning, simply switch off the unit,
allow to cool to room temperature, wipe with a
damp cloth and buff with a soft, dry cloth.
- Light scratches and blemishes may be removed by polishing
the unit. Unit should be switched off
and allowed to cool, before polishing with a commercially
available metal polish.
- Under no circumstances should abrasive cleaners be
used to clean the unit.
- Warranty
Five year warranty, with proof of purchase, will apply if
all Terms and Conditions of Sale
are met and Installation Instructions are adhered to.
Parts
included with unit
Allen wrench (1)
Philips screws #8 x 2.5” (4)
Brass Tapered Bushing (4)
Slotted Bolts (4)
Stainless Tube Assembly (4)
Marking Disc (1)
Cover plate (1)
Screws for Cover plate (2)
Wire Connectors suitable for 12-
16 AWG wire (6)
Installation
Instructions ( Download Adobe Reader to view this PDF file )
|
|